Operations and Maintenance Manual
Pond" loed on the quarry floor, just north of the Sump Pond. The pond allows for coarse and fine grained sediments to settle out. Water then flows through a geotextile/sand filter loed in the southeast corner of this pond and into a final settling pond ("Secondary Settling Pond"), which was built in February 2005. The purpose of