Nammuldi Overland Conveyor Stage 2 | Process 26
The second stage of the Cape Crushing interim tonnes project was to install a primary crushing station and overland conveyor circuit parallel with the stage 1 plant. Process 26 was engaged to complete the design, procurement and construction of these works which required a purpose built 2500tph overland conveyor system which integrated with the existing Rio Tinto Iron Ore Nammuldi operations.